Project Details:
This orchard development was delivered through a carefully planned, staged programme over two years, allowing the grower to build the block progressively while maintaining control over timing, budget, and orchard operations. The scope included full installation of posts, wirework, and shelter infrastructure, with each stage sequenced to suit seasonal requirements and future production goals. This approach ensured the orchard structure was developed methodically, without compromising strength, alignment, or long-term performance.
By maintaining consistency across the entire development the orchard benefits from a well integrated structure that is built to handle the long term demands of farming. Headlands spaced to suit the land owners current and future machinery operations where accessibility of large ag equipment is required.